Customization: | Available |
---|---|
Color: | Variety |
Appearance: | Liquid |
Still deciding? Get samples of US$ 1/kg
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Description
Maydos JD2000 Epoxy Self-leveling Flooring System is two-component solvent-free epoxy paint. lt has a nice appearance, dust-resistant,corrosion-resistant and easy to clean. The flooring system has good bonding with the solid base, good abrasion resistance and durability. Meanwhile,it has certain toughness, brittle-resistance and the load of a certain weight.The compressive strength and impact resistance ability is excellent.
Feature
High hardness
Wear-resistance & impact resistance
Smooth mirror-like surface
Solvent free and environment
Model: | JD2000 |
Solvent Type: | Oil-base |
Mixing ratio: | A:B=5:1 |
Touching dry: | 12h(25°C) |
Hard dry: | 7 days(25°C) |
VOC content: | ≤2%(after mixing) |
Surface preparation |
Correct substrate preparation is critical for optimum performance. Surface should be sound, clean, dry and free from loose particles,oil,grease,and other contaminants. |
Primer |
Prepare a barrel, pour JD-D10A and JD-D10B in it based on 1:1. Stir the mixture well and then apply it with roller or trowel. The reference consumption is 0.15kg/m².The main purpose of this primer is to seal the substrate completely and avoid air-bubbles in the body coat. A second coat may be required depending on the oil absorption condition of substrate. The recoat time is about 8 hours. |
Inspection standard for the primer: even film with certain brightness. |
|
Undercoat |
Mix WTP-MA and WTP-MB based on 5:1 first, then add quartz powder (1/2 of the mixture of A and B) into the mixture, stir it well and apply with trowel. The consumption quantity of A and B is 0.5kg /sqm. You can do it one coat at one time or two coats at two times. In the second case, the application interval is about 8 hours at 25 degrees. Sand the first layer, clean it and then apply the second layer. After the whole application, wait another 8 hours, grind it, clean the sanding dust and then continue the next procedure. |
Inspection standard for the undercoat: Non-sticky to hand, no softening, no nail print if you scratch the surface. |
|
Top coat |
Mix JD-2000A and JD-2000 B based on 5:1 and then apply the mixture with spatula. The consumption quantity is 1.0kg/sqm. |
Maintenance |
5-7 days. Don't put the floor into use or wash it with water or other chemicals. |
1.How can you prove that you are a paint manufacturer rather than a trading company?
As the one of The Top 5 paint manufacturer in China.We have many years of experience since 1996 in production and export,welcome to visit our factory at any time.
2.How about the price ?
We can offer the best wholesale price which depend on the quantity of the order.
3.I need to make sure the quality and the color .
Our pleasure! We can offer the liquid Free sample for you to test and color chart.
4.If the product is not ideal, what can we do?
We have perfect after-sales service to help to complete the construction smoothly.
Even if there are any unexpected things in your order, we will assist to solve them.
5.What's your MOQ (min order quantity),production period and delivery time?
Our MOQ is 200kg . We accept mixed order and the production period and delivery time are 7-10 days.
6.I want to put my Logo on the packing .
We can accept the OEM, waiting for your details requirement.