Customization: | Available |
---|---|
Appearance: | Solvent |
Main Raw Material: | Polyurethane |
Still deciding? Get samples of US$ 1/kg
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Technical data | |
Shelf Life | 12 months (use up in 4 hrs after mixing) |
Gloss | Glossy, Matt, Semi-glossy |
Solids content (Finish): | 35-40% |
Solids content (Primer) | 40-45% |
Theoretical Coverage (mixed complex): | Finish: 12-14m2/kg/coat Primer: 12-14m2/kg/coat |
Drying: (25ºC , relative humidity 60%) | Touch Dry: 20 minutes Hard Dry. 12 hours |
Application Method: | Brush,Spray |
Storage: | Always store in cool & dry places and avoid ignition & heat |
Painting procedures | Application Explanation | Remark |
1.Substrate Polish | Clean off stain with 320# sand paper or with polishing machine | Substrate should be smooth, flat and free of grease, dust etc. |
2. Sealer | Sealer: Hardener = 1: 0.25 | To seal the substrate. |
3. Polish | Polished with 320# sand paper or with polishing machine | Polish the coarse surface for 3-4 hrs. |
4. White primer | Base: Hardener: Thinner = 1:0.3:(0.8-1) | Apply 2-3 times and then polish after each coat dries. |
5. Polish | Polish with 400-600# sand paper | Polish for 3-4hrs till the surface has no bright point. |
6. Top coat | Matt paint : Hardener: Thinner = 1:0.5:1 Glossy paint: Hardener: Thinner=1:1:(0.8-1) |
Apply 2-3 times and no need polish or stop between each coat. |
1.How can you prove that you are a paint manufacturer rather than a trading company?
As the one of The Top 5 paint manufacturer in China.We have many years of experience since 1996 in production and export,welcome to visit our factory at any time.
2.How about the price ?
We can offer the best wholesale price which depend on the quantity of the order.
3.I need to make sure the quality and the color .
Our pleasure!We can offer the liquid Free sample for you to test and color chart.
4.If the product is not ideal, what can we do?
We have perfect after-sales service to help to complete the construction smoothly.
Even if there are any unexpected things in your order, we will assist to solve them.
5.What's your MOQ (min order quantity),production period and delivery time?
Our MOQ is 200Kg. We accept mixed order and the production period and delivery time are 7-10 days.
6.I want to put my Logo on the packing .
We can accept the OEM, waiting for your details requirement.