Guangdong, China
Business Type:
Number of Employees:
Year of Establishment:
Plant Area:
21933.0 square meters
Average Lead Time:
Peak season lead time: within 15 workday
Off season lead time: within 15 workday
OEM/ODM Service
Sample Available
MEI Awards

Epoxy Floor Paint, Epoxy Paint, Ground Paint/Varnish manufacturer / supplier in China, offering Maydos 1mm Epoxy Self-Leveling Floor Paint (JD2000/JD1000), Neoprene Adhesive, Maydos Factory Direct Sale Stone Paint and so on.

Gold Member Since 2009
Audited Supplier
Supplier Homepage Products Epoxy Floor Paint Maydos 1mm Epoxy Self-Leveling Floor Paint (JD2000/JD1000)

Maydos 1mm Epoxy Self-Leveling Floor Paint (JD2000/JD1000)

Get Latest Price
Min. Order: 1 Ton
Production Capacity: 5000 Ton/Month
Transport Package: 20 Kg Per Tin
Payment Terms: L/C, T/T, Western Union, cash
Appearance: Liquid
Main Raw Material: Epoxy
Method: Roller
Level: Finish Coat
Substrate: Concrete
Solvent: Free

You Might Also Like


Basic Info

Model NO.: JD2000/JD1000
Use: Building Coating
Trademark: Maydos
Specification: International Standard
Origin: Guangdong, China

Product Description

1. Smooth surface like mirror.
2. Seamless, easy to clean.
3. Chemicals resistant
4. Solvent-free and environmental friendly.
Maydos self-leveling Floor Paint

Maydos JD2000 Epoxy Self-leveling Floor Paint is a kind of two-component solvent-free epoxy paint. It is durable, dust-resistant, corrosion-resistant and easy to clean. This epoxy floor paint can stick to the base very well. It is most suitable for the floor of dust-free and non-bacteria areas like pharmacy factory, hospital, precision machinery, electronic factory, etc.

Application Procedure:
1. Substrate preparation: Correct substrate preparation is critical for optimum performance. Surfaces should be sound, clean, dry and free from loose particles, oil, grease, and all other contaminants
2. Primer: Mix JD-D10 A and JD-D10B according to 1: 1 by weight, the reference dosage is 0.15kg/sqm. The main purpose of this primer is to seal the substrate completely and avoid air-bubbles in the body coat. According to the oil absorption of substrate, a second sealer coat may be required. The paint should be stirred evenly after mix, then apply directly. Use roller for application and then wait for 8 hours to recoat.
Inspection standards for the primer: Even film with certain brightness.
3. Mix JD-D10 A and JD-D10B based on 1: 1 and add appropriate quartz sand and then apply. After it hardens, wait for 12 hours to continue the next process.
4. Putty: Grind with 325# sand paper or grinding machine and remove the ash. Mix JD-D10A and JD-D10B according to 1: 1 ratio and add appropriate quartz powder and then apply directly with drawknife. Wait for 12 hours to continue the next process. Wait for 12 hours to construct the next process.
Inspection standards for the putty: Non-sticky to hand, no softening, no nail print if scratch on the surface.
5. Finish: Mix JD2000A and JD2000B based on 5: 1 and then use the trowel for application.
Inspection standards for the putty: Even film, no bubbling, uniform color and good scratch. Resistance.
Maintenance: 5-7 days. Don't use or wash with water and other chemicals

OEM service provided.

Send your message to this supplier

avatar Mr. Ken Hu

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now