Gold Member Since 2009
Audited Supplier
Guangdong Maydos Building Materials Limited Company

Garage Floor Paint Epoxy, Garage Flooring Paint, Painting Garage Floor manufacturer / supplier in China, offering Chemical Resistance Garage Floor Epoxy Paint Garage Floor Painting, Medium-grain Wall Coating (M430R, M530R, M630R, M730R), Chloroprene Rubber Adhesive (High Viscidity) (AA08) and so on.

(/ )

Supplier Homepage Product Epoxy Floor Paint Chemical Resistance Garage Floor Epoxy Paint Garage Floor Painting

Chemical Resistance Garage Floor Epoxy Paint Garage Floor Painting

FOB Price: Get Latest Price
Min. Order: 1,000 Square Meters
Production Capacity: 5000 Ton Per Month
Transport Package: 25kg
Payment Terms: L/C, T/T, Western Union

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: JD-102
  • Appearance: Liquid
  • Method: Roller
  • Drying Method: Air Drying
  • Substrate: Concrete Mortar
  • Formation Mechanism: Conversion Type
  • Impact Resistance Strength (Kg@Cm): 65
  • Adhesive Force Grade: 1
  • Abrasion Resistance(750g/1000r, Zero Gra: <0.3
  • Resistance to 50% Sulfuric Acid for 20 D: No Change
  • Service Life: 8 Years
  • Specification: ISO SGS
  • Color: Colors on Color Chart
  • Main Raw Material: Epoxy
  • Level: Finish Coat
  • Certification: ISO14001, ISO9001, SGS
  • Components: Film Forming Matter
  • Compressive Strength (MPa): ≥85
  • Flexural Strength (MPa): >75
  • Hardness (Shore D): >83
  • Resistance to Engine Oil, Diesel Oil for: No Change
  • Resistance to 25% Sodium Hydroxide for 3: No Change
  • Trademark: Maydos
  • Origin: Guangdong
Product Description

Model: JD-102 (Top coat) JD-100 (Primer)
Maydos Acrylic Court Paint

Description:
JD-102 is a kind of economical acrylic airtight organic paint, mainly used for outdoors courts of tennis,
basketball, badminton, volleyball etc. It is suitable for environments of all kinds of climate, wearable,
anti-slip, waterproof, sun protection. It can form a dense and elastic coating on the substrate which can
adjust the rotary force of the ball speed and prolong the service life of the ball and the sports shoes.
With its soft colors and gloss, it can also reduce the surface reflection effectively.

Advantages:
1. Wearable, dense and elastic surface
2. Weathering resistant and anti-ultraviolet
3. Waterproof and anti-slip
4. Bright colors, soft gloss
5. Easy application and economical
Configuration of Coating System:
Top coat
Undercoat
Primer
Substrate Substrate
Requirements for the base:
1. Concrete strength≥C25;
2. Flatness: the maximum altitude difference of 2M running rule<3mm.
3. The moisture content of the base<4%
 
Technical Data:
Impact resistance strength (Kgf/cm/cm2): 8.9
Tensile strength (Kgf/cm2): 74
Adhesive strength (Kgf/cm2): 21.1
Hardness (Shore A): 82
Wearing test (g): 0.203
Extensibility: 15%
Recommended Consumption:
Primer: 0.15kg/sqm
Undercoat: 0.6kg/sqm
Quartz Sand: 1.2kg/sqm
Top coat: 0.6kg/sqm

Application instructions:
1. Correct substrate preparation is critical for optimum performance. Surface should be smooth,
clean, dry and free from loose particles, oil, grease, and other contaminants.
2. Laitance and loose part of the substrate should be removed completely. Use hammer, shovel or
grinding machine to get rid of the risings and ensure the surface is smooth enough.
3. If the concrete floor is a new-built one, wash it with hydrochloric acid to get rid of alkali on it. For
floor more than 1 year old, no need this step. The concentration of hydrochloric acid is between
5-10%. Usually speaking, the higher the alkaline of the concrete, the higher the concentration of the
used acid. After this, wash the floor with clean water to ensure there is no acid left on the floor.
4. Primer: Apply the primer directly on the surface with a rake. The consumption quantity is about
0.15kg/sqm. The drying time is about 3-4 hours.
5. Undercoat: Mix JD-102 with quartz sand (100-120 grit) and then apply the mixture with rake for twice.
The application interval is about 8-10 hours. The consumption quantity of undercoat is 0.6kg/sqm
and that of quartz sand is 0.6kg/sqm. Water can be added based on the stickness of the mixture,
but water must be controlled between 30-50%. The first coat is done vertically and the second coat
horizontally. Ensure the application is done in a straight line and all the area must be covered.
6. Top coat: Apply the top coat over the undercoat with rake for twice. The application interval is
about 8-10 hours. The consumption quantity of undercoat is 0.6kg/sqm and 30-50% of water can be
added. The first coat is done vertically and the second coat horizontally. Ensure the application is
done in a straight line and all the area must be covered. During the application of paint of different
colors, ensure the previous color has become dry before you apply another one. Colored cloth strip
can be used to differentiate different color zone during application.
7. Drawing line: Use chalk to draw lines on the top coat based on the design and cover the lines with
masking tape. Ensure the width and sizes are the ones you want and then apply the special drawing
line paint in the space formed by masking tape. Two coats are required. Apply the second coat after
the first coat becomes dry. Take off the masking tape after the surface dry of the second coat. Don't
wait until it dries completely.
 
Application Cautions
1. A waterproof layer is necessary under the concrete surface.
2. Try to do the application in the morning or evening of an unwindy day. Application is not
recommended in rainy days or under the burning sun.
3. Don't apply the paint too thick each time to avoid cracking of the paint film.
4. Shelter the paint from rain within 48 hours after the application of top coat.
5. Don't apply the paint when the temperature is above 35ºC.
You Might Also Like
Send your message to this supplier
Avatar
Mr. Neo Song
*From:
To: Mr. Neo Song
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

Find Similar Products By Category